The job

Pre-construction

What the job starts from.

  • Record

    The pre-construction pack

  • The duty

    CDM 2015

  • Where it is used

    Before the site opens

What it does

  • Hazards already known, site constraints, and what the designers have to hand over.
  • The design risk register, and who accepted each item.
  • The F10 prepared when the job is notifiable. We do not send it for you.

On the record

  • Hazards already known are on the job before the first induction.
  • Each design risk has a person who accepted it.
  • The F10 sits with the pack when the job is notifiable. Filing it with the HSE stays with you.

The duty

  • CDM 2015

    Pre-construction information is what the construction phase starts from.