Pre-construction
What the job starts from.
Record
The pre-construction pack
The duty
CDM 2015
Where it is used
Before the site opens
What it does
- Hazards already known, site constraints, and what the designers have to hand over.
- The design risk register, and who accepted each item.
- The F10 prepared when the job is notifiable. We do not send it for you.
On the record
- Hazards already known are on the job before the first induction.
- Each design risk has a person who accepted it.
- The F10 sits with the pack when the job is notifiable. Filing it with the HSE stays with you.
The duty
CDM 2015
Pre-construction information is what the construction phase starts from.
Also in The job
All- Set the job upThe project exists before the first person arrives.
- The phase planHow health and safety will be managed on this job, kept current.
- Gates and hold pointsThe next step does not start while one in front of it is open.
- RAMS and methodsThe method for the task, specific to this site.
- Drawings and documentsThe current set, not the one from last month.
- Inductions and competenceWho is cleared to be on this site, and who is not.
- The site diaryWhat happened on the job that day.
- Changes to the planThe job changes. The plan has to move with it.
- HandoverThe pack the client gets, and the file the job closes on.