The job
The site diary
What happened on the job that day.
Record
The diary
The duty
CDM 2015
Where it is used
Written the same day
What it does
- Who was on site, what moved, what was held, and the weather if it mattered.
- Written the same day as the inspection and the permit. Photos if they help.
- Not a separate book the office has to chase.
On the record
- The diary, the inspection, and the permit are the same day on the same job.
- What was held is already a gate or an action, with a name.
- The office reads the file. It does not chase a notebook.
The duty
CDM 2015
The principal contractor plans, manages, and monitors the construction phase. The record is how that is shown.
Also in The job
All- Set the job upThe project exists before the first person arrives.
- Pre-constructionWhat the job starts from.
- The phase planHow health and safety will be managed on this job, kept current.
- Gates and hold pointsThe next step does not start while one in front of it is open.
- RAMS and methodsThe method for the task, specific to this site.
- Drawings and documentsThe current set, not the one from last month.
- Inductions and competenceWho is cleared to be on this site, and who is not.
- Changes to the planThe job changes. The plan has to move with it.
- HandoverThe pack the client gets, and the file the job closes on.