The job
Inductions and competence
Who is cleared to be on this site, and who is not.
Record
Who is cleared
The duty
CDM 2015
Where it is used
At the gate, before they start
What it does
- Site rules, emergency, welfare, and the hazards particular to the job. Done before they start.
- Cards and tickets in date, from the training record on Pure Safety.
- Subcontractors cleared before they are given a gate to pass. A visitor is not the same induction.
- A gap shows before they are put on the task, not after.
On the record
- Cleared, or not cleared, is on the job before they start.
- Cards and tickets are read from the training record. They are not typed in again.
- A visitor induction is a different record from a site induction.
The duty
CDM 2015
Information, instruction, and training for the people on the site.
Also in The job
All- Set the job upThe project exists before the first person arrives.
- Pre-constructionWhat the job starts from.
- The phase planHow health and safety will be managed on this job, kept current.
- Gates and hold pointsThe next step does not start while one in front of it is open.
- RAMS and methodsThe method for the task, specific to this site.
- Drawings and documentsThe current set, not the one from last month.
- The site diaryWhat happened on the job that day.
- Changes to the planThe job changes. The plan has to move with it.
- HandoverThe pack the client gets, and the file the job closes on.