Changes to the plan

The job changes. The plan has to move with it.

  • Record

    The new version

  • The duty

    CDM 2015

  • Where it is used

    When the job changes

What it does

  • A change to the method, the sequence, or the residual risk is a new version of the plan or the RAMS.
  • It is not a note in an email. It is on the record, with an owner.
  • Commercial variations and cost sit elsewhere. This is the construction and safety record.

On the record

  • The previous version stays. The site is pointed at the current one.
  • The owner of the change is named before the gang uses it.
  • Cost and commercial variations are not stored here.

The duty

  • CDM 2015

    The phase plan is reviewed when the job changes.