The job

Gates and hold points

The next step does not start while one in front of it is open.

  • Record

    The gate

  • The duty

    CDM 2015

  • Where it is used

    Before the next step starts

What it does

  • Design risk accepted, inductions done, permits in date, scaffold handed over, power-on, and the ones you add for the job.
  • Open means that step has not happened. Closed means someone on the job marked it.
  • An open gate is the reason the programme is stuck. You are not guessing which meeting it was lost in.

On the record

  • Each gate has an owner. The next step waits.
  • A permit, an induction, and a scaffold handover can be the thing the gate is waiting on.
  • An open gate is visible on the day, not in the Friday report.

The duty

  • CDM 2015

    The principal contractor plans, manages, and monitors the construction phase. The record is how that is shown.