Set the job up
The project exists before the first person arrives.
Record
The job file
The duty
CDM 2015
Where it is used
Before anyone arrives
What it does
- Name, location, client, and the CDM duty holders. Principal designer and principal contractor named.
- Phases of the work: pre-construction, site works, structure, fit-out, commissioning, handover.
- Who owns each phase. A blank job is not a plan.
On the record
- The job has a name, a client, and the duty holders before the gate opens.
- Each phase has an owner. You are not reconstructing the job from emails.
- The phase plan, the gates, and Pure Safety start from this record.
The duty
CDM 2015
Duty holders are named before the construction phase starts.
Also in The job
All- Pre-constructionWhat the job starts from.
- The phase planHow health and safety will be managed on this job, kept current.
- Gates and hold pointsThe next step does not start while one in front of it is open.
- RAMS and methodsThe method for the task, specific to this site.
- Drawings and documentsThe current set, not the one from last month.
- Inductions and competenceWho is cleared to be on this site, and who is not.
- The site diaryWhat happened on the job that day.
- Changes to the planThe job changes. The plan has to move with it.
- HandoverThe pack the client gets, and the file the job closes on.