Skip to content
Back to Consultancy

The work · For the project

CDM

Principal designer and principal contractor support.

  • Record

    The phase plan and the file

  • The duty

    CDM 2015

  • Where it is used

    From pre-construction to handover

What it does

  • Pre-construction information, the design risk register, and the phase plan.
  • The F10 prepared when the job is notifiable. We do not send it for you.
  • Duties written as gates on the job, with an owner.
  • The health and safety file at handover. The job does not close on a missing pack.

On the record

  • The duty holders are named on the job.
  • A gate is how a CDM duty is tracked. It has an owner.
  • The file at the end is the one the site used.

The duty

  • CDM 2015

    Client, designer, principal designer, and principal contractor. We support the duty. We do not take it from you.