Back to modules
Permits
Permits to dig
The excavation, and what is under it.
On the file
The excavation, the services, the drawing, and the depth.
Duty
HSE excavation guidance and CDM 2015
Where it is used
At the dig, before the ground is opened.
What it does
- Services located, and the drawing that shows them.
- The method, and the depth.
- Closed when the ground is back, not when the digger leaves.
On the file
- The services located
- The drawing that shows them
- The method
- The depth
- Services found during the dig
- Close only when the ground is back
Why digital
Against a paper file, a spreadsheet, or a folder in the cabin.
- The drawing and the permit are together.
- Services found on the day are added before the dig continues.
The duty
UK law. We name it. We do not invent a badge.
HSE excavation guidance and CDM 2015
Services located before you dig. A permit is the control.
Who uses it
The person in charge of the excavation. A service found on the day is added before the dig continues.
Sits with
The drawing and the permit stay together.
What good looks like
Nothing is dug until the services are on the permit. It closes when the ground is back.
Also in Permits
All modules- Permits to workHigh-risk work does not start until the permit is live.
- Hot workThe area, the time it runs out, and who signed it.
- Confined spaceThe entry, the atmosphere, and the standby.
- Lock out tag outThe isolation, and who holds the key.
- Work at height permitsThe access, and the people cleared to use it.
